Mendix Academy - Crash Course - Module 10 - Missing chart instructions

2
While following the (further excellent) crash course i ran into the following issues: 10.2.4 Display Unassigned Shifts in a Dashboard In the introduction a bar chart is mentioned: “This page will contain a report grid with the numeric values per department and a bar chart displaying the number of unassigned shifts visually.” But the instructions to do this are missing. The chart is also mentioned in the 10.3 summary. 10.2.1 Create Mock Data The instructions: “Add a Create object and a Change list activity to the flow between your Merge and your Decision.” are probably old, and refer to how a self-build while loop was used in a previous version of this course (instead of the new build-in while loop)    
asked
0 answers