Excel importer imports some months not correct

0
With the Excel Importer (5.4.1) we import a .xls file with in some columns date values. In Excel the dates are visible as d-M-yyyy. After import, all dates of January, February, March, November and December are imported with 1 day less than the original excel date. So in excel the date 6-3-2014 will be 5-3-2015 in Mx. All dates of the other months are imported correctly. The database is PostgresSQL 9.4 A bug, a ghost or do I miss something
asked
1 answers
0

This seems like it is related to daylight savings/timezone issues. What happens if you set the date fields to be not localized?

answered