We are happy to announce that we will be releasing 2.2.1 version of SIMATIC S7 Connector on 26th August 2024
What’s new in SIMATIC S7 Connector 2.2.1 version:
When you want to have secure communication with PLC, then it needs to be configured explicitly in SIMATIC S7 Connector with the required certificates.
The update to version 2.2.1 will work without any issues if you have used unsecure communication or secured communication with CA signed certificates in your current configuration.
In case you are using only secured communication in PLC with self-signed TLS certificates and not configured the certificate under Optimized S7 Connection, then after the update to version 2.2.1 the connection to the PLC will fail and data will not be published.
To resolve that you need to configure the certificate in the configurator and deploy the project again, in order to establish the secure connection to the PLC and get the data.
For full details about the changes and the required steps please refer to the User Manual:
https://docs.industrial-operations-x.siemens.cloud/r/en-us/simatic-s7-connector
Thank you very much.