How to upgrade mendix studio pro without losing old project data

0
Hi, I want to move or upgrade Mendix studio pro from 9.5 to 9.6 without losing my old project.  Can someone please assist me with how could I do.? Thank You 
asked
2 answers
5

if you don't want to lose the 9.5 revision especially if it’s the mainline you can create a branch from your mainline or the branch that you are working on and do the upgrade on it without effecting your current version, and it’s all depends on your strategy about the upgrade.

answered
2

Nour is right. If you want to do it the easy way, you can also just open the existing project in the new Mendix Studio Pro locally. As long as you don’t commit it, nothing is lost. If it works as expected, you can commit, if not you can delete the project and check out the old version.

answered